Babraham Research Campus – Building 900. CambridgeScope of Works
- The installation of 100 single and double FD30 doors, ironmongery and steel wrap around frames on behalf of Hutton Construction.
- The doors and steel frames were supplied by BestofSteel (BoS), whom we are a UK preferred installer.
- This project also involved the installation of 80 glazed panels also supplied by BoS.
- All ironmongery was supplied by HAF.
- The project duration was 6 weeks during 2016.
- Project leads: Blaine Heard and Paul Volke.