One Stop Doctors, Hemel HempsteadScope of Works
- The installation of numerous FD30s and FD60s door-sets and glazed screens as well as various non-fire rated doors and frames on behalf of Hutton Construction.
- The doors and steel frames were supplied by BestofSteel (BoS), whom we are a UK preferred installer.
- This was a 6 month project which also involved the installation of IPS panelling from Venesta.
- All ironmongery was supplied by HAF.
- Project leads: Blaine Heard and Mark Draper.